You are in: Home > Vacancies > 2009 > January > 8th

Jump to supplementary content.

All Entries from 8th January 2009

Recently Posted

Senior Process Engineer
8th Jan, 2009. 13:11 GMT by Tom James. Permalink
Our client requires a Senior Process Engineer for Front End Engineering Design work for various nuclear waste treatment and decommissioning projects.
Safety Case Engineer
8th Jan, 2009. 13:02 GMT by Tom James. Permalink
Our client requires a Safety Case Engineer required to join the Safety Team at Thatcham.
Radiation Protection Advisor
8th Jan, 2009. 12:48 GMT by Nikki Ambler. Permalink
The work is within a highly diverse and challenging consultancy environment. The RPA will work with a number of highly experienced radiological protection specialists providing advice to a wide range of Companies involved with the handling of radioactive materials. These range from small users where we provide audits of compliance with the requirements of IRR99 through to the provision of cutting edge decommissioning and radiological protection advice to major multinational plant operators and site licensees.
Lead Design Engineer
8th Jan, 2009. 12:19 GMT by Tom James. Permalink
Ref no. 593/APT. The Lead Engineer works alongside the discipline specific engineers in the Client team to ensure that project deliverables meet their specific requirements. The role works alongside the Engineering Manager and provides a line management position to discipline specific project team. A Lead Engineer will be expected to fulfil this duty on multiple projects.
Systems Engineering Support
8th Jan, 2009. 11:44 GMT by Tom James. Permalink
Ref no. 591/GOS The purpose of the job is to validate system design manual translation and demonstrate that the EPR design and subsequent modifications brought to the design are ALARP (modifications validated for FA3 that will be applied on UK EPR and/or improvement of UK EPR design compared to FA3 one).
Environmental Support
8th Jan, 2009. 11:20 GMT by Tom James. Permalink
Ref no. 590/GOS. The successful candidate will be responsible for the additional studies required following the November submission of the PCER.